• August

    12

    2016
  • 692
  • 0
Window Replacement Pt. 2

Window Replacement Pt. 2

For this project we replaced three old and drafty wood windows with new Simonton 5500 replacement windows. We removed the existing wood trim on the exterior and replaced it with Azek trim material. Azek is a PVC material that will not rot. The customer now has a maintenance free windows.

This is the 2nd job that we have done for them. They are slowly replacing all of the windows. Check out a similar window replacement.

010

Before: Old Drafty Windows

Before: Old Drafty Windows

Before: Old Drafty Windows

014

Before: Old Basement Windows

015

Before: Old Basement Windows

1a (4)

After: New Efficient Basement Windows w/ Azek Trim

1a (2)

After: New Efficient Basement Windows w/ Azek Trim

LEAVE A COMMENT

You comment will be published within 24 hours.

Cancel reply
© Copyright 2015 PBS Installation by Keith Dolon